-
The foundations that shape our lives
- /en/blog/the-foundations-that-shape-our-lives
12.02.2026 Hightech-Infrastruktur für die Energiewende: Neue Prüfstände ermöglichen realitätsnahe Tests bis 100 kW Heizleistung und stärken Österreichs Rolle als Innovationsstandort für klimaneutrale W
-
SPEED-FT
- /en/research-topics/structural-dynamics-and-assessment/projects/speed-ft
used in initial applications in Germany, was further developed for use on Austrian motorways and tested in practical trials. Both in Austria and Germany, concrete road pavements have proven their efficiency
-
FULL-MAP
- /en/research-topics/hybrid-electric-aircraft-technologies/projects/full-map
digitalises and automates the entire battery development process – from material development to cell testing. The use of artificial intelligence, machine learning, automated synthesis and high-throughput c [...] and interfaces. Development of AI-controlled autonomous synthesis robots to efficiently synthesise, test and further develop novel materials through data-driven iterations. Strengthening the European research
-
MULTI-FUN
- /en/research-topics/wire-based-additive-manufacturing/projects/multi-fun
and LCA will be performed on 7 industrial demonstrators, addressing structural parts, moulds and test equipment for aerospace, automotive and general industrial usage. By wide usage of cost-effective
-
Performance and function tests for heat pumps
- /en/solutions/heat-pump-technologies/performance-and-function-tests-for-heat-pumps
Performance and function tests for heat pumps Accredited Performance and Function Tests for Heat Pumps The AIT heat pump laboratories offer accredited performance and function tests for the following heat [...] direct evaporation-to-water heat pumps up to 35 kW. Additionally, AIT conducts independent accredited tests in accordance with EN 14511, EN 15879, EN 14825, and EN 1210 standards. Heat Pump Laboratory Services [...] EcoDesign Regulation (813/2013) EMC and sound measurements Accredited performance and functional tests for the following heat pump technology Air-to-water heat pumps (up to 75kW heating capacity) Brine/water
-
SIC-GaN Hybrid T-Type
- /en/solutions/power-system-technologies/development-of-power-electronics/sic-gan-hybrid-t-type
examining the dynamic performance of Si, SiC, GaN MOSFETs and IGBTs is the double pulse test (DPT). Double pulse testing allows the precise measurement of energy losses during both the turn-on and turn-off
-
How to test video games
explains why the analysis of games is so important and what possibilities and methods are available for testing (video) games. Interested? Here you can find the whole guest article Further information about
-
Steam without gas
this range. With the NEFI innovation network, we have the opportunity to scientifically support and test new key technologies such as these with industrial users. This reduces the technical and economic
-
GeSMo
- /en/research-topics/integrated-mobility-systems/projects/gesmo
scientific concepts (accessibility models, time geography, weighting of indicators etc.) and has been tested for two selected locations. During the two years’ duration of the project the target groups were
-
SmartThroughGender+
- /en/research-topics/digital-resilient-cities/projects/smartthroughgender
the gender + approach. This is to identify requirements and areas for action. In order to validate, test and clarify the results at the overall level, a qualitative analysis is carried out at district level
-
ICE GENESIS
- /en/research-topics/hybrid-electric-aircraft-technologies/projects/ice-genesis
a validated new generation of 3D icing engineering tools (numerical simulation tools and upgraded test capabilities), addressing Appendix C, O and snow conditions, for safe, efficient, right first time
-
IntelLiGent
- /en/research-topics/sustainable-smart-battery-manufacturing/projects/intelligent
processes cutting edge materials to final electrodes on pilot scale. Promising material candidates are tested in multilayer pouch cells and electrodes are distributed to partners for further development. David
-
GEPROBA
- /en/research-topics/wire-based-additive-manufacturing/projects/geproba
of large components more efficient and economical. In the project, the optimized process is being tested on components for truck trailers, electric motors and battery systems. The design phase ensures that
-
ThreatGet
- /en/ueber-das-ait/center/center-for-digital-safety-security/fairs-events/it-sa-2023/threatget
_Brochure_EN_Web.pdf pdf (2 MB) AIT_ CyberSecurity -Infographic_EN.pdf pdf (622 KB) AIT_PenetrationTesting_DE.pdf pdf (2 MB) × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff
-
LarGo!
- /en/largo
certified and provided with a digital stamp. Simulation and field tests The effects of such large-scale rollout and update processes cannot be tested in a real network for security reasons. For this reason, c [...] developed, tested in the rollout and their mutual influence examined. The lakeside town of Aspern, where selected applications are to be automated and rolled out over a large area in a field test, plays a
-
GrazLog
- /en/research-topics/transport-optimisation-energy-logistics/projects/grazlog
l models. These decision bases are used to make preparations for the installation of a hub and to test the cooperatively used hub in a subsequent trial operation. For this purpose, a neutral cooperation
-
Paths to the Great Transformation
- /en/blog/paths-to-the-great-transformation
"triumph of research The Corona crisis was not only present in the form of rigorous controls on PCR testing at the entrance to the congress center and by wearing FFP2 masks indoors, it was also omnipresent [...] 12.02.2026 Hightech-Infrastruktur für die Energiewende: Neue Prüfstände ermöglichen realitätsnahe Tests bis 100 kW Heizleistung und stärken Österreichs Rolle als Innovationsstandort für klimaneutrale W
-
Green Heat Pump
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/green-heat-pump
as well as control of different system components 2) Heat pump unit: developing, assembling and testing of a 30 kW lab-scale air/water pilot heat pump under stationary and transient conditions 3) Component
-
GREENLAND
- /en/research-topics/green-processes/projects/greenland
practical application and to solve the final obstacles to wider use. The major objectives are to: test the remediation efficiency and success in pilot field case studies develop a toolkit to quantify the [...] the remediation progress and targets (no total, but "bioavailable" trace element fractions) test different technologies of biomass valorisation (incineration, gasification, biodiesel production, etc.)
-
GRELL
- /en/research-topics/acoustics-and-noise-abatement-in-the-transport-sector/projects/grell
The models have been validated on full scale fatigue tests. The acoustic properties have been evaluated in a study performing in-situ acoustic tests on real noise barriers at different ages. The project
Searched for "test".
Found 854 results in 28 milliseconds.
Displaying results 641 to 660 of 854.