-
Electra - Voltage and frequency control for future power
- /en/research-topics/power-system-planning-operation/projects/electra-voltage-and-frequency-control-for-future-power
years project 13.1 M€ budget with 10M€ EC contribution under FP7 Project partners AIT Austrian Institute of Technology (Technical Coordinator) RSE (Project Coordinator) VITO LABORELEC DTU VTT CEA Fraunhofer [...] Engineer / Power and Renewable Gas Systems +43 (0) 50 550-6382 +43 (0) 50 550-6390 helfried.brunner(at)ait.ac.at Project website
-
CLUE
- /en/research-topics/power-system-digitalisation/projects/clue
bharath-varsh.rao(at)ait.ac.at Key Facts Project start: July 2019 Project duration: 36 months Project partners: Austria: Project management AIT Austrian Institute of Technology GmbH with Energienetze [...] consumption within a community. The international research project CLUE, led by the AIT Austrian Institute of Technology GmbH, developed know-how on optimized design, planning and operation of energy communities [...] CLUE has successfully tested and implemented varied technological and market solutions with the commitment of leading European research institutes, industry specialists, and local partners across five
-
AI-optimized energy infrastructure
- /en/research-topics/power-system-digitalisation/projects/ai-optimized-energy-infrastructure
stefan(at)ait.ac.at Key facts Project duration: 04/2024 - 09/2026 Project website Project coordinator AIT Austrian Institute of Technology GmbH Project partner Siemens AG Österreich TU Vienna - Institute of Computer [...] e curve as the basis for AI-based capacity management for low-voltage grids. The Austrian Institute of Technology (AIT) leads this research project, contributing its domain expertise in scenario development [...] supporting the validation of the developed methods to ensure practical and future-proof solutions. The AIT Center for Energy develops algorithms to enhance the resilience of energy infrastructures, including
-
ERIgrid 2
- /en/themen/power-system-digitalisation/projekte/erigrid-2
2024 gewährt. Projektstart 01. April 2020 Projektdauer 4.5 Jahre Projektpartner AIT Austrian Institute of Technology GmbH (AIT) - Coordinator Commissariat à l’énergie atomique et aux énergies alternatives [...] die nun auch für externe Benutzer*innen geöffnet werden. Das Center for Energy des AIT Austrian Institute of Technology leitet das europäische Konsortium innovativer Forschungs- und Entwicklungslabors, [...] European Commission (JRC) Fraunhofer IEE (IEE) Ormazabal Corporate Technology, A.I.E. (OCT) OFFIS EV – Institute for Information Technology (OFF) Ricerca sul Sistema Energetico (RSE) RWTH Aachen University
-
E3@SCHOOL
- /en/research-topics/power-system-digitalisation/projects/e3school
Systems +43 50550 6640 mark.stefan(at)ait.ac.at Key Data Project duration: 03/22 - 02/25 Project parnters: Stadt Klagenfurt (Lead) AIT Austrian Institute of Technology GmbH Bundesimmobiliengesellschaft m [...] makes for an attractive charging option. AIT’s role AIT’s role in this project is to ensure efficient load and energy management. To accomplish this, the AIT Center for Energy is developing a real-time
-
MetabuildingLabs
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/metabuildinglabs
Construction Technology Platform, European Aluminium, European Network of Living Labs, Housing Europe, Hormipresa, Research Institute of Sweden, Bundesanstalt für Materialforschung und -prüfung, Austrian Institute [...] Scientifique et Technique de la Construction, Ecowise Ekodenge LTD, Luxembourg Institute of Science and Technology, Coveris, Terrell, Edilians, Poly-Ouvrages, Materalia, Aramis, Built Enviroment Commons [...] Fundación Cartif, Idonial Technology Center, Fundación Tekniker, Viviendas del Principado de Asturias, University of the Basque Country, Spanish Construction Technological Platform, Ekodenge, T.C. Basaksehir
-
PowerPack Immobilie II
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/powerpack-immobilie-ii
involved. Project duration 01.07.2020 till 30.09.2021 Project partner in the consortium AIT Austrian Institute of Technology GmbH, Center for Energy Facility Management Austria (FMA) Client and project coordinator [...] grid-friendly buildings of the future. Based on the results of the project "PowerPack Immobilie I", AIT is developing a mission statement for energy flexible buildings, that supports thermal- and electrical [...] requirements and to exploit the full potential of energy-flexible buildings and building networks in the Austrian market. The project "PowerPack Immobilie II" is supported by a broad majority of the FM-industry
-
Green Heat Pump
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/green-heat-pump
start: December 2012 Project duration: 45 months Project partners AIT Austrian Institute of Technology (Coordinator) Fraunhofer Institute for Solar Energy Systems , Germany Kungliga Tekniska Högskolan (KTH) [...] pumps for retrofitting buildings in urban areas. It addresses key features of future heat pump technology, which include the use of low global warming potential (GWP) refrigerants, advanced component design [...] (KTH), Sweden Hesch Schröder GmbH , Germany Emerson Climate Technologies GmbH , Germany Ziehl-Abegg AG , Germany SAPA AB , Sweden AKG Gruppe , Germany Eurpean Heat Pump Association , Belgium Funding line:
-
IEA HPP Annex 43
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/iea-hpp-annex-43
into the international project and passed on to Austrian stakeholders. Project partners Austrian Institute of Technology (AIT) - Coordinator TU Graz, Institute of Thermal Engineering (IWT) The project is being [...] Fraunhofer ISE (Germany, Operating Agent) AIT Engie SA (France) CNR ITAE (Italy) ORNL (USA) Stone Mountain Technologies (USA) University of Warwick (UK) Korea Institute of Energy Research (South Korea) More [...] part of an IEA research cooperation on behalf of the Federal Ministry of Transport, Innovation and Technology. International project The IEA HPP Annex 43 aims at the diffusion of sorption heat pumps in residential
-
BIMBestand
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/bimbestand
Stadt der Zukunft 6. Aussschreibung (2018) Projectpartner Technological University Graz (Lead), AIT Austrian Institute of Technology GmbH, Technological University Vienna, buildingSMART Austria, Airport Wien [...] Gerhard Zucker Senior Scientist / Sustainable Thermal Energy Systems +43 50550-6591 gerhard.zucker(at)ait.ac.at Key Facts Project Start: 01.11.2019 Project Duration: 36 Monate Project Website: www.bimbestand
-
HVAC Positioner
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/hvac-positioner
system) perfectly according to current regulations and personal preferences. The AIT Austrian Institute of Technology has developed a method to minimize noise emissions of the population in urban areas [...] Nachricht * Send Ing. Christian Köfinger , MSc Business Manager / Heat Pump Technologies +43(0) 50 550-6509 christian.koefinger(at)ait.ac.at [...] HVAC Positioner The first App for selecting the most suitable heat pump AIT Center for Energy developed the first APP for optical and acoustic positioning of heating and cooling devices Heat pumps are
-
BIM – Building Information Modeling
- /en/themen/efficient-buildings-and-hvac-technologies/projekte/bim-building-information-modeling
Server, Properties und die Zukunft am Bau Als Innovationspartner arbeiten das AIT Austrian Institute of Technology , Austrian Standards und Digital Findet Stadt gemeinsam an der Weiterentwicklung der bestehenden [...] und die Berücksichtigung der möglichen Mehrsprachigkeit. Anfang 2020 kam das AIT Austrian Institute of Technology auf Austrian Standards zu und bot an, bei der inhaltlichen Weiterentwicklung mit spezifischem [...] zwischen A.S.I. und AIT ermöglicht die Einarbeitung und Freigabe von neuen Merkmalen (Vorarbeiten des AIT) unter definierten Qualitätssicherungsprozessen durch das zuständige Komitee bei Austrian Standards. Nun
-
Gasthermenersatz (gas boiler replacement)
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/gasthermenersatz
systems is perhaps the greatest challenge . To find a solution, Ochsner Heat Pumps and AIT - Austrian Institute of Technology are working on a joint project to develop a modular heat pump with environmentally [...] heat pumps is only at the beginning of its success story. Ochsner Wärmepumpen and AIT - Austrian Institute of Technology are working in a joint project on the development of cost-effective, modular heat [...] replace gas boilers in large-volume residential buildings. Heat pumps are now the dominant heating technology in new buildings. The heat pump provides far more thermal energy than the electrical energy that
-
IEA HPP Annex 50
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/iea-hpp-annex-50
project start: December 2016 project duration: 50 months project partners AIT Austrian Institute of Technology GmbH TU Graz - Institut für Wärmetechnik (IWT) fundings: Forschungskooperation Internationle [...] potential of heat pump technology for the energy supply of multiple family apartment buildings, as well as to eliminate consisting market barriers. Concepts and innovative technology options for heat pumps [...] Energieagentur, Auschreibung 2015 project website: http://heatpumpingtechnologies.org/annex50/ AIT contact: DI (FH) Andreas Zottl × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail
-
ADA-EE
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/ada-ee
October 2015 Project duration: 36 months Project partners: AIT Austrian Institute of Technology GmbH (Lead), Vienna University of Technology, Automation Systems Group, UBIMET GmbH, Caverion Österreich [...] Gerhard Zucker Senior Scientist / Sustainable Thermal Energy Systems +43 50550-6591 gerhard.zucker(at)ait.ac.at
-
SilentAirHP
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/silentairhp
Project duration: 42 months Project partners: Austrian Institute of Technology GmbH (single R&D project) Funding line: Energy Research Program, 1st Call 2014 AIT contact: Christoph Reichl × Kontakt Formular [...] Reichl Sustainable Thermal Energy Systems +43(0) 50550-6605 +43(0) 50550-6679 christoph.reichl(at)ait.ac.at
-
IEA HPT Annex 51
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/iea-hpt-annex-51
months project partners AIT Austrian Institute of Technology GmbH TU Wien, Institut für Hochbau und Technologie, Forschungsbereich für Bauphysik und Schallschutz TU Graz, Institut für Wärmetechnik Öster [...] Wissenschaften, Institut für Schallforschung funding: Forschungskooperation Internationale Energieagentur, Ausschreibung 2017 project website: http://heatpumpingtechnologies.org/annex51/ AIT contact: DI Dr [...] project is to further increase the acceptance of heat pumps and to minimize market barriers and technological competitive disadvantages by reducing Das Projekt zielt darauf ab, die Akzeptanz von Wärmepumpen
-
BIM parameters for building materials
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/bim-parameters-building-materials
Energy Systems +43 50550-6591 gerhard.zucker(at)ait.ac.at Key Facts Project Duration: 9/21 - 8/23 Project Partner: AIT Austrian Institute of Technology GmbH Digital Findet Stadt Zukunftsagentur Bau ZAB [...] tools and other IFC-capable tools. The results were adopted by Austrian Standards (A.S.I.) on November 22, 2023 and incorporated into the Austrian BIM standard ÖNORM A6241-2. Funding Tool This project receives
-
Sozial100%Erneuerbar
- /en/research-topics/efficient-buildings-and-hvac-technologies/projects/sozial100erneuerbar
„liveable“ for residents. Project start June 2021 Project duration 36 months Project partner AIT Austrian Institute of Technlogy GmbH Schöberl & Pöll GmbH Wohnbauvereinigung für Privatangestellte Gemeinnützige [...] a research and technology program of the Federal Ministry for Climate Action, Environment, Energy, Mobility Innovation and Technology. It is managed on behalf of the BMK by the Austrian Research Promotion [...] pursues the goal of making these technologies affordable and acceptable in social housing. To achieve a proper energy balance of the borehole field, the following technologies are applied: asphalt collectors;
-
IEA HPT Annex 61
- /en/themen/efficient-buildings-and-hvac-technologies/projekte/iea-hpt-annex-61
reichl(at)ait.ac.at Eckdaten Projektstart: 01.11.2022 Projektdauer: 36 Monate Projektpartner: Universität Innsbruck, Institut für Konstruktion und Materialwissenschaften (Nationale Teamleitung) AIT Austrian [...] Austrian Institute of Technology GmbH AEE INTEC
Searched for "Bernadette Fina, AIT Austrian Institute of Technology".
Found 1198 results in 147 milliseconds.
Displaying results 381 to 400 of 1198.