-
Safe and longlasting: solid-state batteries of the future
- /en/blog/safe-and-longlasting-solid-state-batteries-of-the-future
forefront of development and is instrumental in providing answers to important future challenges.’ Test-emphasises Alexander Svejkovsky, AIT Managing Director for Finance, Processes and Administration.
-
GROOVE
- /en/research-topics/road-condition-monitoring-assessments/projects/groove
results, a concept for the laboratory work was developed. Test specimen with different concretes were then produced in the laboratory and durability tests were carried out with regard to weather impact and traffic [...] load was examined. The laboratory results showed that sufficient durability of skid resistance on the test tracks was expected from the applied grinding texture. Also, in direct comparison to the exposed aggregate
-
GEPROBA
- /en/research-topics/wire-based-additive-manufacturing/projects/geproba
of large components more efficient and economical. In the project, the optimized process is being tested on components for truck trailers, electric motors and battery systems. The design phase ensures that
-
Sekohs Theiss
- /en/solutions/network-operators-energy-service-providers/sekohs-theiss
new large-scale 3MW PV system. This hybrid storage system is validated through comprehensive field tests and its operation is optimized using innovative methods. The improvements include extended forecasting
-
BatterieSTABIL
- /en/research-topics/hybrid-power-plants/projects/batteriestabil
investigated theoretically in an offline simulation, which will be validated in laboratory and field tests afterwards. Eventually a practical realization of the defined operation strategies will be implemented
-
FELDBATT
- /en/research-topics/hybrid-power-plants/projects/feldbatt
storage deployment with regards to the different services provided. Installation of a demonstrator to test the developed business models and control algorithms under real-life conditions. The innovative aspects
-
ABS4TSO
- /en/research-topics/hybrid-power-plants/projects/abs4tso
system services, several implementations are examined through comprehensive simulations, laboratory tests and field trials. Combining this with a regulatory and economic analysis, a clear framework can be
-
Urban Transport Tbilisi
- /en/research-topics/integrated-digital-urban-planning/projects/urban-transport-tbilisi
has been adapted to match the local circumstances in Tbilisi. In March and April 2017 there was a test survey with AIT staff and four local participants, followed by further adaptations on the survey tool
-
UrbanLight
- /en/research-topics/integrated-digital-urban-planning/projects/urbanlight
people's behavior in street spaces. The project Three different lighting scenarios were evaluated in the test area of Blumauergasse in Vienna's second district. First the existing, conventional street lighting
-
TransportBuddy
- /en/research-topics/integrated-digital-urban-planning/projects/transportbuddy
simulation allowed to model real scenarios in different infrastructures. These functionalities enable to test possible applications of an autonomous vehicle in advance and support the optimization of algorithms
-
Schönbrunn Palace - Simulation in Visitor Management
- /en/research-topics/integrated-digital-urban-planning/projects/schoenbrunn-palace-simulation-in-visitor-management
simulation-based route planning Adaptation of existing tours (e.g. by changing the sequence) and testing of new tours Optimization of the overall offer on the basis of the expected number of visitors and [...] duration of tours. Sense provides the basis for further planning and simulations. Plan: Ideas are tested in simulations and the effects of different control and steering measures or alternative route planning
-
auto.Bus – Seestadt
- /en/research-topics/integrated-mobility-systems/projects/autobus-seestadt-1
routes than the city centre. Though, on the other hand, Seestadt is also an innovative urban area – a test area of a smart city. The autonomous bus will be put through its paces on private land before its [...] It is powered by an electric motor, can take up to 10 passengers and is already navigating various test around the world routes today. The bus travels at speeds of up to 20 km/h and one of the 11 spaces
-
FX-Future eXperience
- /en/research-topics/integrated-digital-urban-planning/projects/fx-future-experience
and the user experience will be evaluated in a Virtual Reality (VR) mobility test environment, which allows for realistic testing and situational evaluation of different situations. The necessary expertise
-
MyFairShare
- /en/research-topics/climate-resilient-urban-pathways/projects/myfairshare
of individual mobility budgets, and identifies effective policy strategies. The potential will be tested in six Living Labs in different context situations, defined by scale (community – municipal – (t
-
österREICHbar
- /en/research-topics/climate-resilient-urban-pathways/projects/oesterreichbar
order to reduce mobility costs, and their implementation potential will be trialled as part of the testing of a guide for regional and local stakeholders and those affected. The focus is on two key groups [...] prepared as guidelines for regional and local stakeholders, whose relevance for implementation will be tested on a pilot basis with regional and local stakeholders and, using a participatory research approach
-
Smart and Carbon-Neutral Urban Development
- /en/research-topics/smart-and-carbon-neutral-urban-development
Smart City & Smart Mobility Solutions A city cannot be transferred to a pure laboratory setting and tested and analyzed accordingly. In this research topic we are concerned with the optimization of concepts
-
Cheetah
- /en/cheetah
ing capacity in all the segments of the value chain in due time. AIT will be responsible for PV testing and characterisation. Success criteria will be defined for the new module Technology, with ultra-thin
-
CoolSkin
- /en/coolskin
into a test façade and monitoring. Concerning the methods the project is based on elaborated system simulations and experimental work with a functional model of the system as well as field tests under real [...] real operating conditions of a test façade. Project start: September 2015 Project duration: 30 months Project partners Institut für Wärmetechnik – Technische Universität Graz (Konsortialleitung) AIT Austrian
-
INFINITY
- /en/infinity
followed by an adaptation and improvement along the module value chain, also through laboratory testing. The industry-driven consortium will also As a result, yield optimized and climate zone-adapted PV
-
Integrated Photovoltaic solutions
- /en/solutions/photovoltaic/integrated-photovoltaic-solutions
: Objective evaluation of module performance under real-world conditions. Quality testing and accelerated aging tests: Ensuring the longevity and reliability of the modules. Advantages of AIT services [...] opportunities: Simulations are used to detect weaknesses and propose improvement measures. PV Module Testing for Specific Applications The quality of the modules used significantly impacts the performance of [...] methods ensure smooth execution. Guaranteed quality for high performance and long lifespan: Rigorous testing and analyses ensure system reliability. The Austrian Institute of Technology offers a comprehensive
Searched for "test'".
Found 826 results in 60 milliseconds.
Displaying results 341 to 360 of 826.