-
ENLIGHTEN
- /en/research-topics/electric-powertrains/projects/enlighten
new standards for future electric vehicles. The role of AIT Austrian Institute of Technology As consortium leader of the ENLIGHTEN project, AIT Austrian Institute of Technology contributes its leading [...] / Electric Vehicle Technologies +43 50550-6529 +43 50550-6595 peter.scheuermann(at)ait.ac.at Project consortium AIT Austrian Institute of Technology (coordinator) Eaton Politecnico di Torino IFP Énergies [...] more powerful and efficient electric vehicles The European research project ENLIGHTEN, led by the AIT Austrian Institute of Technology, is developing a new generation of electric drives with an operating
-
Usability- and User Experience Training
- /en/solutions/technology-experience/usability-and-user-experience-training
your request (including desired date and number of participants) by e-mail to experience-training(at)ait.ac.at . We will get in touch with you immediately. How much does the CPUX-F training cost? The costs [...] members). Included in the fee are the preparation for the certification exam, the official UXQB and AIT training documents in printed form as well as meals (lunch, drinks and snacks). The costs are exclusive [...] s • User Interface and Web/Mobile Designer • Software Developer • Analysts Why CPUX-F Training at AIT? The certification preparation is held by our experienced trainers. You will join the manageable group
-
Rapid vulnerability analysis for cities
- /en/research-topics/climate-resilient-urban-pathways/projects/rapid-vulnerability-analysis-for-cities
Coordinator +43 664 8251002 +43 50550 4548 tanja.toetzer(at)ait.ac.at Key facts: Project start: 01.03.2023 Project end: 31.03.2024 Project coordinator: AIT Austrian Institute of Technology GmbH Project partners: [...] resilience. Illustration of a vulnerability profile Expertise and Project Conclusion The consortium of AIT, TU Vienna, and PlanSinn combined expertise in vulnerability and resilience indicators, digital tools
-
Sustainable Mobility for Airport Connectivity
- /en/research-topics/flexibility-business-models/projects/smac
(modal split), the needs of travelers, and the factors that could motivate a shift to public transport. AIT supports this by designing the survey and applying the Stated Preference / Revealed Preference methodology [...] behavior patterns of travelers. Based on this data, tailored services and measures will be developed. AIT’s tasks include the design and impact analysis of airport services such as baggage transfer, as well [...] 2020. Key Facts Project duration: 10/24-09/26 Project partner: PLANUM Fallast & Partner GmbH (Lead) AIT Austrian Institute of Technology GmbH BRIMATECH Services GmbH FH JOANNEUM Gesellschaft mbH × Kontakt
-
Project Marktprämien 2.0
- /en/research-topics/flexibility-business-models/projects/project-marktpraemien-20
Integrated Energy Systems +43 664 88335405 carolin.monsberger(at)ait.ac.at Key facts Project duration: 11/2023 - 05/2025 Project partner: AIT Austrian Institute of Technology GmbH (Lead) REKK Regional Centre
-
HeatMineDH
- /en/research-topics/flexibility-business-models/projects/heatminedh
Integrated Energy Systems +43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key data Project Duration: 09/23 - 08/26 Project Partner: AIT Austrian Institute of Technology GmbH EURAC HAWK University University
-
REFORMERS
- /en/research-topics/flexibility-business-models/projects/reformers
(Coordination: Professor Thierry Coosemans) NEC - New Energy Coalition , the Flagship Valley Coordinator AIT Austrian Institute of Technology Alliander CERTH center for research & technology Hellas CIRCE — Research [...] Nicolas Pardo-Garcia Scientist / Integrated Energy Systems +43 50550 6083 nicolas.pardo-garcia(at)ait.ac.at × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff * Nachricht [...] Engineer / Power and Renewable Gas Systems +43 (0) 50 550-6027 +43 (0) 50 550-6390 johannes.kathan(at)ait.ac.at Key Data Projektwebsite Project duration: 11/23 - 10/28 Funding This project has received funding
-
Geothermal heating and cooling networks for industry, commerce and residential buildings
- /en/research-topics/flexibility-business-models/projects/geothermal-heating-and-cooling-networks-for-industry-commerce-and-residential-buildings
energy and other energy efficiency measures. Project partners The CASCADE consortium, led by the AIT-Austrian Institute of Technology, brings together partners from various sectors such as research, [...] Senior Scientist, Sustainable Thermal Energy Systems +43 50550 3608 +43 50550 6390 edith.haslinger(at)ait.ac.at Key data Project start: 2022 Duration: 3 Jahre Project partner: Brauerei Hofstetten Krammer GmbH
-
transpAIrent.energy
- /en/research-topics/flexibility-business-models/projects/transpairentenergy
Integrated Energy Systems +43 664 78588129 klara.maggauer(at)ait.ac.at Key Fact Project website Project duration: 05/24 - 04/27 Project partner: AIT Austrian Institute of Technology GmbH (Lead) B-SEC better
-
CityStore
- /en/research-topics/flexibility-business-models/projects/citystore
Scientist / Integrated Energy Systems +43 50550-6420 demet.suna(at)ait.ac.at Key Data Project duration: 09/2019 - 10/2021 Project partners: AIT Austian Institute of Technology Grazer Energieagentur Ges.m.b [...] of cavern storage for district heating in Graz without thermodynamic simulation of the rock. Method AIT was the consortium leader and was responsible for the identification of relevant storage technologies
-
Wind power potential in Bulgaria, Hungary and Romania
- /en/research-topics/flexibility-business-models/projects/wind-power-potential-in-bulgaria-hungary-and-romania
level within a country by NUTS-3 region. Key Facts Project Duration: 12/22 - 11/23 Project Partner: AIT Austrian Institute of Technology GmbH (Lead) REKK Regional Centre for Energy Policy Research Funding [...] Gustav Resch Thematic Coordinator Energy Scenarios and System Planning +43 664 88964986 gustav.resch(at)ait.ac.at × Kontakt Formular Pflichtfelder sind mit einem * markiert. Name * E-Mail * Betreff * Nachricht [...] Mag. Lukas Liebmann Research Engineer / Integrated Energy Systems +43 664 88904366 lukas.liebmann(at)ait.ac.at Publications ECF Study on Wind Potentials - Background Data ECF Study on Wind Potentials – Country
-
H2Real
- /en/research-topics/flexibility-business-models/projects/h2real
Integrated Energy Systems +43 664 88964995 stefan.reuter(at)ait.ac.at Key Facts Project duration: 05/23 - 05/26 Project partner: Wien Energie GmbH (Lead) AIT Austrian Institute of Technology GmbH Austrian Power [...] hydrogen economy and shall thus lead to a visible reduction of the regional hydrogen price. The role of AIT is: In-depth modelling and systemic analysis of the Hydrogen Valley to identify optimal production
-
T2LowEx
- /en/research-topics/flexibility-business-models/projects/t2lowex
+43 50550-6390 ralf.schmidt(at)ait.ac.at Key Facts Website: FFG | Klimafonds Project duration: 05/2017 - 03/2021 Project partner: TU Wien, Energy Economics Group (LEAD) AIT Austrian Institute of Technlogy [...] conventional heating networks to low network temperatures is the goal of the T2LowEx project. The AIT developed innovative business models for the implementation of measures to reduce return temperatures
-
DeRiskDH
- /en/research-topics/flexibility-business-models/projects/deriskdh
+43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key Facts Project website Project duration: 01/23 - 01/26 Project partner: Wien Energie GmbH (Lead) AIT Austrian Institute of Technology AEE - Institut
-
TEMPO
- /en/research-topics/flexibility-business-models/projects/tempo
Systems +43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key facts Projektwebsite Project duration: 10/2017 - 3/2022 Project partner: VITO (Lead) AIT Austrian Institute of Technology GmbH NODA Thermaflex
-
100% renewable Pinzgau
- /en/research-topics/flexibility-business-models/projects/100-renewable-pinzgau
Energy Systems +43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key data Project website Project duration: 01/21 - 6/21 Project partner: AIT Austrian Institute of Technlogy GmbH (Lead) Regionalverband
-
H&C Markets
- /en/research-topics/flexibility-business-models/projects/translate-to-english-hc-markets
+43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key facts Project website Project duration: 7/2020 - 7/2022 Project partner: Fraunhofer ISI (LEAD) AIT Austrian Institute of Technology GmbH University [...] European Commission, with a focus on district heating (DH) and heat pumps (HP) for end customers. The AIT analysed and compared the different cost components for the users of district heating and heat pumps
-
Memphis 2.0
- /en/research-topics/flexibility-business-models/projects/memphis-20
664 88964995 stefan.reuter(at)ait.ac.at Key data Project website Project duration: 08/21 - 01/23 Project partner: University of Applied Sciences and Arts (HAWK) (Lead) AIT Austrian Institute of Technology [...] "MEMPHIS" project. The aim is to further develop the existing "Waste Heat Explorer". In this context, AIT a) identified and analysed future waste heat sources, which included the decarbonisation of industrial
-
BM RETROFIT
- /en/research-topics/flexibility-business-models/projects/bm-retrofit
Senior Research Engineer / Integrated Energy Systems +43 50550-6695 +43 50550-6390 ralf.schmidt(at)ait.ac.at Key data Project start: 01.02.2023 Duration: 36 Months Project partner: AEE Intec BEST - Bioenergy
-
LocalRES
- /en/research-topics/flexibility-business-models/projects/localres
MSc, MSc Head of Competence Unit Integrated Energy Systems (IES) +43 (0) 50 550 6077 tara.esterl(at)ait.ac.at Key Data Project Start: 2022 Duration: 4 Years Project partners: CARTIF Technology Center Artelys
- «
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138
- 139
- 140
- 141
- 142
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- »