Filter
Search results
900 results found
Results 411-420 of 900-
Im-Fluge
travel paths, the project enables prototype development and testing of (1) confidence-building user interaction with automated flights, (2) attractive flows and spatial characteristics of intermodal
-
Relevance:
-
-
Steam without gas
network, we have the opportunity to scientifically support and test new key technologies such as these with industrial users. This reduces the technical and economic risk for companies on the road to
-
Relevance:
-
-
Im.Fluge: Urban Air Mobility revisited
intermodal travel routes, this enables prototypical development and testing of future confidence-building user:inside interaction with automated flights, attractive processes and spatial characteristics of
-
Relevance:
-
-
VR Training for resilience enhancement according to Viktor Frankl
and a virtual reflection room ("Room of Possibilities") in which test persons could engage with their experiences. The empirical, accompanying study revealed an overall high acceptance of the VR training
-
Relevance:
-
-
Increase quality through optical inspection
makes ICI largely independent of the surface properties of the test objects," explains Markus Clabian, Head of Competence Unit High-Performance Vision Systems at AIT. © AIT/voestalpine Boehler Edelstahl [...] Nevertheless, it has now been possible to develop an innovative testing method and bring it to industrial maturity. In this process, a camera is permanently installed above a test object that is moving [...] developing the system," reports Plant Manager Peter Markiewicz. © AIT/Test Banknote with kind permission of the OEBS The results of the scan of a test banknote bearing the likeness of the painter Gustav Klimt
-
Relevance:
-
-
StoreITup-IF
“StoreITup!” polymer-based-PCM storages will be constructed and tested in laboratory and operational environment. The storages are expected to be industrially producable and economically viable (‹50 €/
-
Relevance:
-
-
BatterieSTABIL
offline simulation, which will be validated in laboratory and field tests afterwards. Eventually a practical realization of the defined operation strategies will be implemented in a continuous storage
-
Relevance:
-
-
ABS4TSO
are examined through comprehensive simulations, laboratory tests and field trials. Combining this with a regulatory and economic analysis, a clear framework can be derived for the contribution of
-
Relevance:
-
-
FELDBATT
different services provided. Installation of a demonstrator to test the developed business models and control algorithms under real-life conditions. The innovative aspects of the project can be described
-
Relevance:
-
-
ABS4TSO
are examined through comprehensive simulations, laboratory tests and field trials. Combining this with a regulatory and economic analysis, a clear framework can be derived for the contribution of
-
Relevance:
-