Filter
Search results
900 results found
Results 851-860 of 900-
Flame Resistant Magnesium Alloys
addition of calcium and yttrium Certification Passed flammability test according to FAA: FAA Aircraft Materials Fire Test Handbook, Chapter 25; Oil Burner Flammability Test for Magnesium Alloy Seat
-
Relevance:
-
-
SilentAirHP
quantification of selected passive measures, noise cancelling will be tested and assessed as active action. The results comprise a set of quantitatively assessed measures for known and innovative noise reduction
-
Relevance:
-
-
Battery Test Laboratory
Battery Test Laboratory In the battery test laboratory, batteries are examined in detail at cell, module and system level. This includes electrical tests, as well as an evaluation of safety through misuse tests. Electrical tests Support in selection of cell technology Function checks [...] at)ait.ac.at Contact batteries(at)ait.ac.at Factsheet Electrical Tests Download Factsheet Abuse Tests Download
-
Relevance:
-
-
Drive Testing Laboratory
Drive Testing Laboratory Testing of Electric Drivetrains and Power Electronics The AIT Austrian Institute of Technology offers excellent research [...] electronic components up to complete electrical drive trains can be tested. The test bench responds to the system based on (vehicle) model and the actual performance of the system. The services include the [...] models Integration of customer ECUs (Electronic Control Units) Testing with the real traction battery or DC-power supplies with a battery model Temperature- and flow-controlled cooling Centralized and
-
Relevance:
-
-
Environmental Testing Laboratory
engineering to maintenance. Our Services Consulting and selection of test methods Practice oriented test planning Conducting of the tests Conducting of acceptance tests Long-term and life cycle tests Reports [...] Climate Temperature Chambers Climate Chambers Heat/Cold/Climate Test Chambers Corrosion Gas Chamber Read more Thermal Shock Thermal shock with two test chambers Read more Low Pressure Low Pressure [...] Vibration Electrodynamic Shaker 1 Electrodynamic Shaker 2 Climate Test Chamber Read more Mechanical Load Pneumatic test stand with 30 push / pull punches Read more Ice - Snow - Weathering Water test (
-
Relevance:
-
-
LKR Leichtmetallkompetenzzentrum Ranshofen
Manufacturing Modelling of Processes and Components Material Testing and Characterisation Facilities ADDITIVE MANUFACTURING LABORATORY COLD CHAMBER DIE CASTING PLANT HORIZONTAL CONTINUOUS CASTING PLANT EXTRUSION PLANT FLAME RESISTANT MAGNESIUM ALLOYS TEST CENTER: MECHANICAL MATERIALS TESTS TEST CENTER: DCS TEST CENTER: DILATOMETER Scanning Electron Microscope ORF/Mayrs Magazin: TV report
-
Relevance:
-
-
Support of the Joint Programming Initiative Urban Europe
as well as project monitoring system will be developed and pilot tested. Furthermore, AIT supports the JPI Urban Europe in self-evaluating specific aspects, e.g. to what extent the JPI Urban Europe has
-
Relevance:
-
-
Battery Technologies
Read more Electrode Preparation and Cell Production Component tests Prototype production Smart Cells with integrated sensor technology Read more Battery testing Safety tests Electrical tests according [...] Post-mortem analysis Accredited electrical, environmental and safety tests on cell, module and system level SOX (State of Health, State of Charge, etc.) determination Simulations in 1 and 3D at cell and
-
Relevance:
-
-
CoolSkin
dimensioning of a functional model, iii) implementation into a test façade and monitoring. Concerning the methods the project is based on elaborated system simulations and experimental work with a functional model of the system as well as field tests under real operating conditions of a test façade. Project start: September 2015 Project duration: 30 months Project partners Institut
-
Relevance:
-
-
Scientific Vision Days
, D. Soukup, H. Penz, W. Krattenthaler, R. Huber-Mörk Automated testing for print inspection systems Peter Wild Interoperability Testing of Optical Security Document Readers Contact × Kontakt Formular
-
Relevance:
-