Filter
Search results
900 results found
Results 571-580 of 900-
Power Conversion Technologies
hydrogen technology, which is complemented by state-of-the-art test laboratories. As an independent technology consultant, AIT provides support throughout the entire procurement process, from conceptual [...] distribution and transmission grids Design and interoperability testing of ICT interfaces Long-term monitoring and operational optimization OUR METHODS The design of power conversion systems is one of [...] Comprehensive laboratory infrastructure for component and system testing Numerous references for procurement support of large-scale storage systems from 250 kVA (250 kWh) to 10 MVA (12 MWh) Faster and
-
Relevance:
-
-
Controller-In-The-Loop CIL
Shorten commissioning and avoid errors during operation by pre-testing controllers on the Digital Building Test Bench. High time pressure, frequent changes in planning requirements and the separation [...] strategies of HVAC systems. At AIT's unique Digital Controller Test Bench, control strategies for building automation systems can be tested at an early stage of the project, problems can be identified [...] already existing models Derivation or cooperative development of test scenarios Coupling of the building controller (hardware) to the building model (digital) Test of the control strategy with inputs
-
Relevance:
-
-
Integrated Energy Concepts
and construction of local heating networks Development and testing of control strategies (controller in the loop) Measures for the integration of electric mobility Creation of a coordinated energy
-
Relevance:
-
-
Quality assurance and testing of PV modules
Manufacturers benefit from precise tests that reveal potential weaknesses at an early stage. Our test procedures in detail: 1. static mechanical load testing The load test [...] their products and minimize maintenance costs. Accelerated ageing tests Long-term UV simulation (e.g. 25 years) Dynamic mechanical load tests Ammonia corrosion test Salt spray corrosion testing Methods [...] ) Climate tests (temperature changes, humidity/heat tests, etc.) Mechanical load tests (e.g. snow load and wind pressure) Fire behavior tests
-
Relevance:
-
-
Technology development with alternative refrigerants
of heat pumps and refrigeration circuits through prototype testing Design and construction of laboratory samples Validation of the simulation models through laboratory measurements Analysis and
-
Relevance:
-
-
Performance and function tests for heat pumps
Performance and function tests for heat pumps Accredited Performance and Function Tests for Heat Pumps The AIT heat pump laboratories offer accredited performance and function tests for the following heat pump technologies: air-to-water heat pumps up to 60 kW, brine-to-water and water-to-water heat pumps up to [...] up to 35 kW. Additionally, AIT conducts independent accredited tests in accordance with EN 14511, EN 15879, EN 14825, and EN 1210 standards. Heat Pump Laboratory Services and competences Measurements
-
Relevance:
-
-
SmartEST Lab
SmartEST Lab INNOVATIVE TESTING TECHNOLOGIES IN THE SMARTEST INVERTER LABORATORY The inverter laboratory at AIT offers a wide range of testing services based on [...] based on typical load profiles in Europe. PERFORMANCE AND LOAD TESTS Continuous performance tests: The inverter is operated at maximum power over an extended period to test thermal stability and load [...] maximum size of devices that can be tested? Devices with dimensions of up to 3.60 x 2.60 x 2.80 m can be tested. What is the maximum weight of the test specimen? This depends
-
Relevance:
-
-
Promoting digital skills
for the self-assessment of digital competencies, a knowledge test for general job-related digital competencies was developed in cooperation with the working group composed by the BMDW and consisting [...] Within the framework of quantitative surveys with several hundred test persons from different occupational groups and sectors, the psychometric quality of the developed items was analyzed by means of statistical testing. Based on the analyses, appropriate implications for improving the instruments were derived. As a result of the 6-month project,
-
Relevance:
-
-
SPEED-FT
Germany, was further developed for use on Austrian motorways and tested in practical trials. Both in Austria and Germany, concrete road pavements have proven their efficiency in the highly loaded road
-
Relevance:
-
-
SOPRANOISE
facts and figures about their acoustic performances in different testing conditions, focusing especially on the differences between the diffuse sound field and direct sound field standardized test methods [...] approach using a sequence of in-situ inspections, quick acoustic testing methods and detailed acoustic testing methods. Each of these methods is used to investigate a sample of the length of noise barrier [...] testing capacity while still being able to identify problematic areas. The research will result in practical guidelines for road authorities
-
Relevance:
-