Development and evaluation of grid- and system-supportive concepts for unlocking EV flexibility at parking facilities
The research project Park2Grid develops and tests innovative concepts to harness the flexibility potential of electric vehicles parked at company, commuter and public parking facilities for the energy system. Through smart and bidirectional charging (Vehicle-to-Grid, V2G), vehicle batteries can serve not only individual mobility needs but also become flexible energy storage resources. This function supports the integration of renewable energy, reduces energy costs and provides grid-supporting services.
The project focuses on developing technically and economically feasible concepts for flexibility utilisation, intelligent control strategies, and user-oriented business models. The requirements of vehicle users, parking facility operators, energy suppliers and grid operators are considered jointly. The developed solutions are assessed through modelling and simulation and subsequently validated under real operating conditions across at least five different demonstration sites, including company parking facilities, park-and-ride facilities and parking garages.
Project goals
Park2Grid takes a holistic approach to unlocking and economically exploiting the flexibility potential of parked electric vehicles. The project combines smart and bidirectional charging, energy management, techno-economic optimisation and the development of viable business models, while comprehensively addressing legal, regulatory and societal framework conditions.
The project aims to assess the energy-related and economic potential of different parking facility configurations, to develop optimised control and flexibility utilisation concepts, and evaluate their contribution to grid and system support. Attention is given to the integration of local photovoltaic generation, the provision of flexibility services, and the requirements and preferences of vehicle users. Building on simulations and real-world demonstrations, the project outcome will be scalable solutions, fair incentive mechanisms and practical recommendations to support widespread implementation. A broadly based consortium, comprising a large number of excellent partners along the value chain, brings the necessary experience, expertise, and implementation capacity required to achieve the project's goals.
Role of AIT
System Architecture and Integrated Flexibility Utilisation Concepts: AIT develops comprehensive system architectures for integrating electric vehicles parked at company and commuter parking facilities into the energy system. This includes defining the required components, interfaces and interactions between charging infrastructure, energy management systems, vehicle users and other market participants, while considering different economic applications and grid-supporting use cases.
Control Algorithms and Energy Optimisation: AIT develops and implements models and optimisation algorithms for the intelligent control of unidirectional and bidirectional charging processes. The developed strategies consider vehicle availability, individual mobility requirements, local PV generation, electricity prices and grid connection constraints, among other factors. The aim is to efficiently manage energy flows, reduce costs and utilise available flexibility in an economically viable and grid-supportive manner.
Simulation and Techno-Economic Potential Assessment: AIT leads the model-based assessment of the energy-related and economic potential of different parking facility configurations. Through simulation and optimisation, various scenarios are analysed, considering vehicle availability, mobility and load profiles, PV generation and charging infrastructure. The results provide a sound basis for future investment decisions regarding smart and bidirectional charging infrastructure.
User-Centricity and Fairness: AIT develops principles and mechanisms to ensure fair and equitable access to charging infrastructure and flexibility services. Attention is given to the allocation of available charging capacity and charging times, as well as the differing needs and requirements of users, to enable broad and non-discriminatory participation in future applications.
Validation and Comparison with Real-World Operation: AIT supports the scientific evaluation of demonstration activities through a systematic comparison of simulation results and monitoring data collected at the demonstration sites. The findings are used to validate modelling assumptions, further improve optimisation approaches and assess the transferability of the developed concepts to different operating conditions.
Scalability and Implementation Recommendations: AIT investigates the scalability and potential impacts of the developed solutions when applied to larger parking facilities and energy system configurations. Building on technical, economic, regulatory and societal validation, the project develops practical recommendations and implementation strategies for companies, energy suppliers, grid operators and policymakers.
Funding
Park2Grid is funded through the Zero Emission Mobility Plus 2025 programme by the Austrian Research Promotion Agency (FFG).
