Inhaltstyp
Kategorien
-
AI and Robotics for the Reuse of Used PV Modules
) as part of the “Test Before Invest” initiative. The AIT Centre for Vision, Automation & Control worked closely with Lower Austrian green tech start-up 2nd Cycle FlexCo to test innovative approaches [...] include: AI-supported optical inspection to assess surface qualityPrecise electrical measurements to test functionalityRobotic replacement of connectors as the first step in refurbishment A central database
-
Milestone in the Project “Industry4Redispatch”
demonstration. During this demonstration, redispatch activation was tested at four Austrian industrial sites. Participants in the test phase included major companies such as MONDI and voestalpine Stahl [...] facilities were pooled to collectively provide flexibility. The demonstration focused on thoroughly testing the redispatch process. Redispatch is an emergency intervention by the grid operator to prevent network [...] next-day consumption schedules to bid placement and redispatch activation, all necessary steps were tested under realistic conditions. The facilities of the participating industrial enterprises successfully
-
Cancellation: Opening of the AIT DC Lab
Austria. With the “go life” of the new facility, AIT is able to offer a strong set of design and testing services for industries in Europe and worldwide for development of new DC technologies.
-
Optimization of photovoltaic self-absorption by using block chain
the residents of "Viertel Zwei". Residents who have "Wien Energie" as their electricity provider can test P2PQ here as a new electricity tariff. The Center for Technology Experience is now investigating how
- 1