Inhaltstyp
Kategorien
-
Milestone in the Project “Industry4Redispatch”
demonstration. During this demonstration, redispatch activation was tested at four Austrian industrial sites. Participants in the test phase included major companies such as MONDI and voestalpine Stahl [...] facilities were pooled to collectively provide flexibility. The demonstration focused on thoroughly testing the redispatch process. Redispatch is an emergency intervention by the grid operator to prevent network [...] next-day consumption schedules to bid placement and redispatch activation, all necessary steps were tested under realistic conditions. The facilities of the participating industrial enterprises successfully
-
Die-casting plants on the way to Industry 5.0
optimisation as well as quality control. The assistance system will be implemented and tested as a prototype on a test machine at the LKR in Ranshofen. The DG Assist project is scheduled to run until April
-
ComForEn 2023
choices Data policy, handling, and compliance toward an open data society Interoperability testing methodologies and facilities Interoperability in specific applications and role interaction:
-
AI and Robotics for the Reuse of Used PV Modules
) as part of the “Test Before Invest” initiative. The AIT Centre for Vision, Automation & Control worked closely with Lower Austrian green tech start-up 2nd Cycle FlexCo to test innovative approaches [...] include: AI-supported optical inspection to assess surface qualityPrecise electrical measurements to test functionalityRobotic replacement of connectors as the first step in refurbishment A central database
- 1